Udemy - Process Piping Design - Vertical Vessels and Distillation...

  • Category Other
  • Type Tutorials
  • Language English
  • Total size 943.6 MB
  • Uploaded By freecoursewb
  • Downloads 73
  • Last checked 1 month ago
  • Date uploaded 1 month ago
  • Seeders 2
  • Leechers 3

Infohash : 3E84F30701A53EA5C36B539908CDEA4ED8A0F79E



Process Piping Design: Vertical Vessels & Distillation Tower

https://WebToolTip.com

Published 11/2025
Created by Atul Singla
MP4 | Video: h264, 1280x720 | Audio: AAC, 44.1 KHz, 2 Ch
Level: All | Genre: eLearning | Language: English | Duration: 14 Lectures ( 1h 24m ) | Size: 944 MB

Master the layout, nozzle orientation, piping routing, and mechanical design of refinery towers using industry standards

What you'll learn
Determine Tower Elevation: Calculate the required vessel height based on NPSH and reboiler hydraulic head to prevent pump cavitation
Design Safe Access: Configure platforms, ladders, and safety cages according to vertical clearance standards (the 2100mm & 3600mm rules).
Optimize Nozzle Locations: Correctly orient manholes, reflux inlets, and instrument nozzles to align with internal trays and downcomers.
Route Process Piping: Design flexibility loops for feed lines and overhead vapor lines to handle thermal expansion.
Engineer Vessel Supports: Select and design proper lifting lugs, davits, and pipe support clips welded to the vessel shell.
Perform Mechanical Calculations: Apply formulas for wind load, seismic load, and shell stress analysis.

Requirements
Basic understanding of engineering drawings (P&ID and Piping Isometrics).
No prior experience with vessel design is required; we start from the basics.

Files:

[ WebToolTip.com ] Udemy - Process Piping Design - Vertical Vessels and Distillation Tower
  • Get Bonus Downloads Here.url (0.2 KB)
  • ~Get Your Files Here ! 1 - Introduction & Fundamentals
    • 1 - Understanding the Vertical Vessel (Tower) Function.mp4 (65.8 MB)
    2 - General Layout & Elevation Strategy
    • 1 - Tower Arrangement Rack Piping & Road Access.mp4 (63.7 MB)
    • 2 - Calculating Installation Height NPSH & Gravity Flow.mp4 (73.5 MB)
    3 - Vessel Accessories & Ergonomics
    • 1 - Designing Platforms & Ladders (Height & Clearance Rules).mp4 (60.2 MB)
    • 2 - Lifting Accessories Davits & Lifting Lugs.mp4 (70.8 MB)
    • 3 - Skirt Design Vents, Access Holes & Insulation.mp4 (68.8 MB)
    4 - Nozzle Orientation Mastery
    • 1 - Manway & Reflux Nozzle Orientation (Avoiding Internals).mp4 (72.9 MB)
    • 2 - Feed & Draw-off Connections (Liquid Pockets & Venting).mp4 (91.8 MB)
    • 3 - Reboiler Configurations Kettle vs. Thermosyphon.mp4 (64.0 MB)
    • 4 - Instrumentation Level Gauges & Thermowells.mp4 (70.2 MB)
    5 - Piping Routing & Stress Analysis
    • 1 - Overhead & Feed Piping Flexibility & Thermal Loops.mp4 (59.8 MB)
    • 2 - Bottoms Piping & Safety Valve (PSV) Discharge Rules.mp4 (52.6 MB)
    6 - Mechanical Design & Structural Calculations
    • 1 - Designing Welded Pipe Support Clips.mp4 (52.7 MB)
    • 2 - Tower Strength Calculations Wind, Seismic & Thickness.mp4 (76.7 MB)
    • Bonus Resources.txt (0.1 KB)

There are currently no comments. Feel free to leave one :)

Code:

  • udp://tracker.torrent.eu.org:451/announce
  • udp://tracker.tiny-vps.com:6969/announce
  • http://tracker.foreverpirates.co:80/announce
  • udp://tracker.cyberia.is:6969/announce
  • udp://exodus.desync.com:6969/announce
  • udp://explodie.org:6969/announce
  • udp://tracker.opentrackr.org:1337/announce
  • udp://9.rarbg.to:2780/announce
  • udp://tracker.internetwarriors.net:1337/announce
  • udp://ipv4.tracker.harry.lu:80/announce
  • udp://open.stealth.si:80/announce
  • udp://9.rarbg.to:2900/announce
  • udp://9.rarbg.me:2720/announce
  • udp://opentor.org:2710/announce
CACHE ❓ RP-FALLBACK 📄 torrent 🕐 03 Feb 2026, 09:05:10 am IST ⏰ 28 Feb 2026, 09:05:10 am IST ✅ Valid for 24d 23h 🔄 Wait 10m